MIDWAY GARRINGTON TERMINAL LTD.
06-13-35-04 W5M
This advanced Battery has been accepting third party production since March 1,
2001. Producers are invited to take advantage of this “state-of-the-art” technology and
competitively priced service. This unmanned facility near Garrington offers the latest in technology
and convenience for both truckers and producers.
Below is the fee structure currently being charged at this facility. These fees have
not changed since inception, therefore we believe that they are very
competitive in today's marketplace.
MIDWAY GARRINGTON TERMINAL FEE STRUCTURE:
|
| Terminaling Fee: |
$2.96/m3 |
All Volumes metered @ offloading dock |
Treating Fee: (If required) |
+$7.23/m3 |
Charged to All Volumes metered at offloading dock exceeding 0.5% water cut |
| Disposal Fee: |
+$5.16/m3 |
If treatment required (fee applies to water only) |
| Equalization: |
as per the "Industry Equalization Scale" adjusted semi-annually |
HOURS OF OPERATION : 8:00 am to 6:00 pm DAILY.
Please
refer to the above links
for more information regarding this Truck Terminal